Scope of Work | Employer Requirements | For FIDIC Silver Book 2017 edition


SCOPE OF WORK FOR FIDIC SILVER BOOK EPC/TURNKEY CONTRACT (2017 EDITION) - THE SCOPE OF WORK DESCRIBES THE EMPLOYER REQUIREMENTS FOR ALL PROJECT FUNCTIONS WHICH ARE REQUIRED FOR THE PROJECT MANAGEMENT, ENGINEERING, PROCUREMENT, CONSTRUCTION, COMMISSIONING & START-UP & HAND-OVER. 

OVER 200 PAGES OF PRE-DRAFTED SCOPE OF WORK CHAPTERS ALIGNED WITH SILVER BOOK TERMS.

THE SCOPE CAN BE USED FOR EPC OR TURNKEY.  SAVE CONTRACT PREPARATION TIME & COST & IMPROVE CONTRACT COMPLIANCE & PERFORMANCE! 

THE SCOPE OF WORK DOCUMENTS ARE PROVIDED IN MS WORD FORMAT & PDF FORM

THE DOCUMENTS ARE DELIVERED IN A ZIP FILE, SEE BELOW FOR CONTENT!

STANDARD LICENCE FOR ONE CONTRACT & EXTENDED LICENCE FOR MULTIPLE CONTRACTS

SEE OUR LOOK-INSIDE SCOPE OF WORK VIDEO BELOW! 


CONTRACT ADMINISTRATION REQUIREMENTS FOR FIDIC SILVER BOOK EPC/TURNKEY CONTRACT (2017 EDITION) - THE CONTRACT ADMINISTRATION REQUIREMENTS DESCRIBE THE EMPLOYER REQUIREMENTS REGARDING THE KEY CONTRACT ADMINISTRATION ELEMENTS AND INCLUDE THE FORMS TO BE USED, SUB-CLAUSE FLOWCHARTS (WHERE RELEVANT) AND REPORTING REQUIREMENTS. ESTABLISH AND ENSURE A CONSISTENT AND HIGH QUALITY ADMINISTRATION!

THE ADMINISTRATION REQUIREMENTS IS PROVIDED IN MS WORD FORMAT & PDF FORM

THE FORMS ARE ALSO INCLUDED IN MS WORD FORMAT.

THE FLOWCHARTS ARE INCLUDED IN MS POWER POINT FORMAT. 

THE DOCUMENTS ARE DELIVERED IN A ZIP FILE, SEE BELOW FOR CONTENT!

STANDARD LICENCE FOR ONE CONTRACT & EXTENDED LICENCE FOR MULTIPLE CONTRACTS

SEE OUR LOOK-INSIDE VIDEO ON THE ADMINISTRATION REQUIREMENTS PRODUCT PAGE.




THE ZIP FILE CONTAINS THE FOLLOWING DOCUMENTS: